Environmental Protection Department of Hong Kong
Environmental assessment
Consultants resurveyed from scratch—decades of data sat in silos. A database and LiDAR now surface constraints before designs lock.
- 30% reduction in EIA consultant costs
- EIA report time cut from 36-48 to 15-24 months
- Tree survey time cut from 8 hours to 1 hour